Stream: git-wasmtime

Topic: wasmtime / PR #4229 Update Cranelift-ISLE integration doc...


view this post on Zulip Wasmtime GitHub notifications bot (Jun 06 2022 at 17:57):

cfallin opened PR #4229 from isle-integration-update to main:

In #4143, we removed the checked-in-generated-code aspect of the ISLE
build process, in order to simplify the development cycle and reduce
errors. However, I failed to update the docs at the same time. This PR
fixes that. Supersedes #4228 (thanks @jlb6740 for noticing this issue!).

<!--

Please ensure that the following steps are all taken care of before submitting
the PR.

Please ensure all communication adheres to the code of conduct.
-->

view this post on Zulip Wasmtime GitHub notifications bot (Jun 06 2022 at 17:57):

cfallin requested fitzgen for a review on PR #4229.

view this post on Zulip Wasmtime GitHub notifications bot (Jun 06 2022 at 18:35):

alexcrichton submitted PR review.

view this post on Zulip Wasmtime GitHub notifications bot (Jun 06 2022 at 18:35):

alexcrichton submitted PR review.

view this post on Zulip Wasmtime GitHub notifications bot (Jun 06 2022 at 18:35):

alexcrichton created PR review comment:

s/dev-dependency/build-dependency/

view this post on Zulip Wasmtime GitHub notifications bot (Jun 06 2022 at 18:42):

cfallin updated PR #4229 from isle-integration-update to main.

view this post on Zulip Wasmtime GitHub notifications bot (Jun 06 2022 at 19:54):

cfallin merged PR #4229.


Last updated: Oct 23 2024 at 20:03 UTC